Laying Out the Site
Soon the sound of chain saws and heavy equipment will fill the air at the Challenge Course site. But before that can happen, much work needs to be done. On Tuesday in a soaking rain, I measured and laid out each individual site. Some of these sites are small (20’x10’) others are quite large (30’x 300’). Although some trees will need removed and some grading and digging will take place, the installation is designed to incorporate and utilize the natural beauty and aesthetics of the site.